Obtain the exact model’s machine dimensions, packed dimensions, weight and electrical appendix first. Then verify the unloading route, installation space, power and grounding, environment, auxiliary equipment, trainees and acceptance media in writing. Use order-specific values rather than generic web figures.
Updated 24 September 2026 · Basis: SUNUSER site-preparation and acceptance manual · Order-specific technical appendix controls all values
Access and final position
- Map the full route from unloading point to final position, including doors, corridors, lifts, turns and level changes.
- Check forklift, lifting, elevator and floor-loading conditions against the order’s packed size and weight.
- Allow space for operation, maintenance, loading, unloading and material flow on a stable level floor.
Power and environment
- A qualified electrician should confirm voltage, frequency, load, dedicated protection and grounding from the model-specific appendix.
- Confirm temperature and humidity control, dust management, ventilation, lighting and protection from direct sunlight.
- Do not force commissioning when power or environmental conditions do not meet the written requirement.
Computer, software and utilities
- Confirm the computer, interfaces, RIP software, network and file-transfer workflow for the order.
- Check whether compressed air, voltage regulation, extraction, worktables, consumable storage or other utilities are required.
- Prepare protective equipment, cleaning tools and consumables approved for the equipment.
Media, people and acceptance
- Prepare real production media, artwork and at least one clearly defined acceptance job.
- Assign operators to attend positioning, calibration, software, maintenance and stop-condition training.
- Record appearance, ordered configuration, motion, nozzles, white, colour, curing, safety, software and the agreed material result.
Frequently asked questions
How many days does installation take?
A generic duration is not reliable. It depends on the model, site readiness, transport condition, calibration, material tests and training scope. Confirm it in the delivery plan.
Can I use a voltage shown on a general webpage?
No. Models and countries differ. Use the signed technical appendix, machine nameplate and a qualified electrician’s confirmation.
Is a good print sample enough for acceptance?
No. Also verify ordered configuration, safety, motion, nozzle condition, software, training and the agreed material test method.